June 13, 2025Uncategorized Sewer Pump Station Refurbishment Project Duration: September 2023 – March 2024 Refurbishment of existing sewer pump station, including
June 13, 2025June 13, 2025Uncategorized Pipe Section Replacement USA Installation of 276 m long OD 324 welded FBPE (Sintakote) SCL pipe-line including bridge crossing section Installation
June 13, 2025Uncategorized Pipeline Construction Indonesia Installation mostly by open trenching of a new water transfer mains, as part of a larger project to provide new water supplies […]
June 13, 2025Uncategorized australia Project Hunter Water Australia Removal and transport of 7000 cu.m filter media from Kurri Kurri WWTW to Cessnock WWTW, placement of the filter […]
June 13, 2025Uncategorized HWC Biosolids Hunter Water Corporation The construction of Biosolids storage areas at various Hunter Water Wastewater Treatment Works (WWTW) across the Hunter Region, including: […]