Sewer Pump Station Refurbishment

Project Duration: September 2023 – March 2024

Refurbishment of existing sewer pump station, including

  • Dewatering approx. 2km of DN375 rising main in and cut in new bypass connection pipework in a single outage
  • By passing flow up to 115L/s with standalone diesel powered bypass pump arrangement
  • Installation of a new mag flow meter, including new 3.2 x 2.4x 2.5m cast in-situ pit
  • New aluminium lids to wet well, valve pit and FM pit
  • New control cabinet, pump connection turrets, new mains connection, site lighting, SCADA/Telemetry installation and miscellaneous electrical refurb of redundant control building
  • Installation of Polybrid lining to wet well.  All new pipe work, flowmeter valves and fittings from pumps to existing rising main
  • Commissioning and operator training of new well
  • Site improvements and restoration, including footpaths, fencing, installation of sandstone blocks, lawn reinstatement